Thermal Power Plant

🏭 Project: Melting and Installation of Refractory Materials

This project involved the melting and installation of refractory materials and welding at units B1 and B2 of the Kosovo B thermal power plant, as part of the project for the supply and installation of expansion connectors for boilers B1 and B2.

📋 Project Description

Our team carried out the installation with high professionalism to ensure stable performance and safety against extreme temperatures.

✅ Results and Client Benefits

  • Maximum safety for power plant personnel and equipment
  • Increased efficiency of the power plant through installation of advanced refractory materials
  • Improved equipment lifespan, reducing the need for frequent repairs

🔧 Work Completed

1. Melting and Installation of Refractory Materials

Description: Execution of melting and installation of refractory materials and welding at units B1 and B2 of Kosovo B thermal power plant.

Benefit: High safety and stable performance for the power plant.

2. Installation of Refractory Materials and Insulation

Description: Installation of refractory materials and insulation around membrane tubes at FGR channel heads in units B1 and B2.

Benefit: Stable protection and maximum safety in environments with difficult operating conditions.

3. Maintenance Work – Kosovo A Power Plant

Description: Maintenance and repair work on refractory materials at units A3, A4, and A5.

Benefit: System adaptation and optimization for high performance and longevity.

4. Refractory Coating of Channels and Moving Plates

Description: Execution of refractory coating for channels and moving plates (3-Year Framework Contract 2024-2027).

Benefit: Long-term safety and stability, optimal performance for 3 years.

5. Replacement of Gates and CFRG Tube Branches

Description: Replacement of gates and CFRG tube branches in boilers B1 and B2.

Benefit: Improved efficiency and long-term protection for industrial systems.