Thermal Power Plant
🏭 Project: Melting and Installation of Refractory Materials
This project involved the melting and installation of refractory materials and welding at units B1 and B2 of the Kosovo B thermal power plant, as part of the project for the supply and installation of expansion connectors for boilers B1 and B2.
📋 Project Description
Our team carried out the installation with high professionalism to ensure stable performance and safety against extreme temperatures.
✅ Results and Client Benefits
- Maximum safety for power plant personnel and equipment
- Increased efficiency of the power plant through installation of advanced refractory materials
- Improved equipment lifespan, reducing the need for frequent repairs
🔧 Work Completed
1. Melting and Installation of Refractory Materials
Description: Execution of melting and installation of refractory materials and welding at units B1 and B2 of Kosovo B thermal power plant.
Benefit: High safety and stable performance for the power plant.
2. Installation of Refractory Materials and Insulation
Description: Installation of refractory materials and insulation around membrane tubes at FGR channel heads in units B1 and B2.
Benefit: Stable protection and maximum safety in environments with difficult operating conditions.
3. Maintenance Work – Kosovo A Power Plant
Description: Maintenance and repair work on refractory materials at units A3, A4, and A5.
Benefit: System adaptation and optimization for high performance and longevity.
4. Refractory Coating of Channels and Moving Plates
Description: Execution of refractory coating for channels and moving plates (3-Year Framework Contract 2024-2027).
Benefit: Long-term safety and stability, optimal performance for 3 years.
5. Replacement of Gates and CFRG Tube Branches
Description: Replacement of gates and CFRG tube branches in boilers B1 and B2.
Benefit: Improved efficiency and long-term protection for industrial systems.